The source-only Synthetic first pass was frozen before the candidate challenge. Actual Grok returns and Chief synthesis rejected an unsupported whole-application-recovery claim. Six signed actor messages and exact inputs passed independent verification. The temporary room is archived with history retained. This is one case, not a universal model benchmark.

Owner-selected project ede2fc4d-af09-489c-b8df-3bd227dac9cd completed in project-homelab: Chief plan, Operations three-document bundle, one real Chief revision, hash-bound approval, three verified new Markdown Drafts and signed main-conversation report. The six frozen Internal technical snapshots stayed with trusted Chief/Ops. The same existing timer advanced ordinary stages without owner continue prompts.

One uncertain revision dispatch required exact setup reconciliation after successful complete-window absence readback. The attempted journal, backup, same revision and original dispatch budget were retained. No manual actor message or new scheduler was used. General unattended transport recovery is not proven.

Canonical working Drafts remain under Homelab/00_Project_Control/Buzz_Operational_Readiness_2026-10-15_Draft_v1 in the project workspace: operational playbook, readiness evidence matrix and ranked backlog. The immutable ledger is execution evidence. Private Git technical copies are recovery material. No account records, source permissions, vault, publication or arbitrary portfolio execution are authorized by this result.

Four offline blind-boundary tests and actual semantic, hash, roster and cryptographic signed-delivery checks pass. Source and sanitized evidence: operations/buzz/blind-review in the existing private Core authority. Phase2 retains the supporting engine, transport and scheduler authority; Phase3 owns this independent acceptance. Selective before-image recovery must reconcile newer writes and preserve revoked identities as revoked.

Public sources

  • None.

Public assets

  • None.